标胶 (STR)

细节: 

标胶在质量上对橡胶工业有着巨大的改变。由于较易控制质量,需求量不断增加。标胶分为三大类型:STR10 STR20 和 STR CV。各个类型是根据生产指标来区别,我们利用机械在实验室进行筛选原材料,使得所生产出的产品到达出口标准。

烟片复合: 

STR 10, STR 20, STR 10 CV 60, STR 20 CV 60 STR 5L, STR XL

包装: 

33.33 公斤和 35公斤以散包装或托盘

过程

过程: 

The quality control early starts since the first step, before acquiring the “Raw Material” from local farmers, LATEX sample is analysed in our laboratory.

Filtering phase will eliminate particles and impurities from latex. Diffrent chemical composition is added to latex depends on type of STR we are planning to produce.

The latex is then poured on a serie of long mould,after chemical reaction, latex will change it status from liquid to solid in about 12 hours. After this step we obtained a very concentrate latex in form of thick sheet rubber.

From Thin Sheet Rubber will be shed to small pieces of 2-3 millimeters by schredding machine.

After passing through a 110 degrees celsius oven, the small pieces will latex transform into blocks.

The block rubber weight is precisely set to 33.33 kgs per block.

The finished block rubber or STR is packed in plastic film, the package is enforced by a structure of wood to protect it content during the transport and easy for handling.

过程: 

Received cuplumps are spread out in the reception area for contamination picking and DRC determination.

DRC Big Slabs of Cup-lumps must be reduced to smaller sizes for effective removal of the contaminants and determination of the contramination levels.

Contaminants removed , cup lumps are stored according to grade and rest to obtain leveled characterisitcs

Upon designated time, cup lumps enter the STR line. Slab-cut, washed and strained to further remove embedded contaminants

Contaminants not removed during the automated processes are removed by hands.

Processed cup lumps are collected in a tank with water overflowing to remove 1. floating particles/contaminants such as raffia, woodchips, branches 2. sinking material such as dirt, sand, gravel sinks to the bottom of the tank and remove periodically.

After series of size reduction, rubber crumbs are crepe in series of decreasing thickness to obtain aggregated rubber crumbs

Crumbs are placed in trolley and oven-dried at 120?C for 7-8 minutes depending on the nature of the input cup lumps

PE Biscuits are baled and packed in PE pouches

Bale are inspected and sampled for 1. white spot/contamination 2. Physical Characteristics

Baled STR blocks are packaged according to the customer specifications.

Rubber bales are tested for the physical properties and are graded as such.